I'm going to post this update with things grouped together, but I seem to have developed a "random" style to completing things, and so it's not necessarily in the order that I've done them. The reason for this is because I start to do a task, the step I think I'm on, and then realize I need to do another part of the layout first before I can finish the task I'm doing. And of course when I start doing this other thing, I realize I need to do some other things. And so on. As long as everything is getting done, I'm not too worried about it.

You saw the plaster coat from last time. It is now painted my base desert earth color.

DSC03310

Here's a closeup looking around the bend in the lower right hand side of the layout. (Side note: I should give this a name perhaps). You can see that in addition to painting the plaster coat, I've also laid down cork roadbed for the track to be layed on.



DSC03309

The scenic location and look that I've picked for the railroad I've narrowed down to the northern part of Arizona. Here are some shots about what I have in mind for the terrain theme for this layout:




I've been asked if there will be cactus -- Yes, there will be a little cactus here and there, but not overwhelmingly so (as in a stereotypical way).

The cork roadbed extends all the way into what will become the tunnel.

DSC03308

And of course how could it be a model railroad layout without track? I've begun to lay this section of track.

DSC03313

The track and ties are held in place with one of my favorite materials -- blue painter's masking tape (the low-tack stuff). The rails are pre-bent before installation, but are still a touch springy. In these cases I've started using pins to help them keep their shape while I work on them.

DSC03315

Leilani recorded a short video of how exactly the track is made, for those of you who were wondering.


Here the subtly rusted tippers sit, waiting for a train to pick them up for the next ore haul...

DSC03319-(2)

I've begun to build the tunnel liners as well. These will be basically cardboard, that's painted black, which will serve as the walls of the tunnel. Here they're just raw cardboard, and I'm dry fitting them to make sure the train can pass through without banging into the walls.

DSC03330

For this particular tunnel, I'm planning on building a wooden tunnel entrance and wooden tunnel lining, like you'd expect from a mining railroad.

Lastly, I layed out some more roadbed, leading into the tunnel on the left, along with dry fitting some of the track.

DSC03336

Here's the overall progress of the layout up to this point...

DSC03338

1 comment:

  1. you better put cactuses after helping you collect those heart things haha.

    ReplyDelete